Modular workforce camps · Guinea

Your teams. Your site. Their workforce camp.

Spaces to work, eat and rest on site. BAT Company helps you design, fit out and install your workforce camp.

  • Layout tailored to your workforce
  • On-site installation

Organise your workforce camp

Examples of space organisation

Plan view
Example daytime worksite camp planOffices, a dining room, changing rooms and sanitation arranged around a central circulation area.Access & circulationOfficesDiningChangingSanitation
Example daytime worksite camp plan. Offices, a dining room, changing rooms and sanitation arranged around a central circulation area.

Capacity, dimensions, equipment and access are defined for your project. These diagrams only illustrate how the functions are organised.

Everyday spaces

Everything your teams need on site.

A workforce camp is organised around your activity. Choose the functions you need and define their capacity based on occupancy and daily site operations.

Offices & meeting rooms

Organise site management, briefings and discussions between your teams.

Bedrooms & rest areas

Provide accommodation and rest areas when your teams stay on site.

Dining room & kitchen

Plan dining spaces and assess the food preparation equipment required.

Changing rooms & storage

Separate personal belongings, workwear and equipment.

Toilets & showers

Define facilities suited to your workforce and available utility connections.

Service rooms

Include storage, technical rooms or laundry facilities to suit your operations.

Spaces, equipment and utility connections are specified during the review of your project.

Our solutions

From a temporary worksite to a complete camp.

Every site has its own constraints. Together, we define a layout suited to your workforce, period of use and required functions.

Solution 01

Daytime worksite camp

Your teams’ daily needs

The essential functions to accommodate your staff during working hours.

  • Offices, dining and changing rooms
  • Sanitation and access to organise
  • Layout tailored to your workforce
Discuss this solution
Solution 02

Camp with accommodation

Work and stay on site

A layout that includes the needs of teams staying for several days or weeks.

  • Bedrooms and rest areas
  • Meals, showers and toilets
  • Separate living and working areas
Discuss this solution
Solution 03

Custom camp

A project for the whole site

A coordinated layout for living, working and service functions.

  • Overall site layout
  • Utilities and access to coordinate
  • Phasing suited to your project
Discuss this solution

A site layout considered as a whole

Beyond the modules, the plan must account for access, utility networks and everyday operations.

Workforce & capacity
Based on each function’s needs
Site layout
Based on the plot and circulation
Utilities & preparation
Services and responsibilities to define
Schedule & deployment
Confirmed before ordering
Scaled to your teams

An organisation that follows your activity.

Workforce, shifts and occupancy duration influence your camp layout. We assess spaces, equipment and placement to support everyday use.

Define my layout

Capacity & floor areas

Workforce, simultaneous occupancy and requirements per space.

Layout & circulation

Access, distances and separation of functions.

Furniture & storage

Workstations, beds and shared spaces.

Comfort & finishes

Ventilation, air conditioning and finishes to assess.

Water & electricity

Utility networks, supplies and wastewater management to plan.

Deployment & expansion

Installation phases and extensions to anticipate.

3D configurator · Member access

Visualise your workforce camp before building it.

Explore your project in our 3D configurator to picture the organisation of spaces and discuss it with our team before finalising your order.

Personal access is granted by BAT Company after reviewing your request.

  1. 01

    Share your needs

    Workforce, duration, functions and site constraints.

  2. 02

    Explore in 3D

    Visualise the spaces planned for your teams.

  3. 03

    Refine the project together

    Confirm choices, feasibility and the scope of the offer.

Your project, step by step

From site review to everyday life on site.

Together, we define the spaces and services required. Each stage prepares the next, from the site layout to installation and support.

  1. 01

    Define your requirements

    Workforce, assignment duration, required functions and site location.

  2. 02

    Visualise your workforce camp

    Review the site layout and explore your project in our 3D configurator.

  3. 03

    Confirm your order

    Confirm the plan, equipment, scope of work and schedule.

  4. 04

    We prepare the modules

    Production and fit-out of spaces according to the agreed layout.

  5. 05

    We install on your site

    Delivery, assembly and connection services included in the quotation.

  6. 06

    We provide ongoing support

    Assistance, maintenance and interventions according to the agreed services.

Frequently asked questions

Prepare your workforce camp.

A remote site, changing workforce or phased deployment? Describe your constraints so we can include them in the review.

Describe my project
01What is a workforce camp?

A workforce camp brings together the spaces staff need each day on a worksite or operating site: offices, dining, changing rooms and sanitation, with accommodation when required. Its composition depends on how you operate and the duration of your activity.

02Which types of sites can use a workforce camp?

A camp can be assessed for a construction site, mining site, industrial facility or a project far from existing infrastructure. The layout and equipment are adapted to the site’s specific constraints.

03How is the required capacity defined?

We start with workforce, simultaneous occupancy, shifts and required functions. Bedrooms, meals, sanitation and offices are assessed separately to define a coherent layout.

04Can bedrooms, a kitchen and sanitation be included?

These functions can be included in the project study. Equipment, utility connections, maintenance and operating conditions are defined with you before the offer is approved.

05What site preparation is needed before installation?

Delivery access, module supports, circulation and utility networks must be assessed. Water and electricity supplies and wastewater management need particular attention. Preparatory works and each party’s responsibilities are specified in the quotation.

06What are the lead times and expansion possibilities?

Lead time depends on the layout, equipment, module availability and site preparation. It is confirmed in the offer. An extension can be anticipated in the site plan, subject to technical feasibility and available space.

07What support is provided after installation?

Support, assistance, maintenance and interventions are defined in the agreed services. The quotation also specifies delivery, assembly and any utility connections.

Let’s discuss your site

How many people do you need to accommodate?

Describe your site and your teams’ needs. This information helps us prepare an initial layout and identify what is needed for your quotation.

  • Workforce and occupancy duration
  • Required working and living spaces
  • The plot and available utilities

Capacity, equipment, services and lead times are confirmed in the offer for your project.

Request a quote